Electrical Firm · Guwahati

Powering the Grid.

Transmission lines, substations and underground cables from 33 kV to 400 kV, built through to energisation.

Transmission Lines

Lines up to 400 kV.

Survey, foundations, tower and monopole erection, stringing, testing and charging.

Substations & O&M

Built, energised and run.

132 kV and 33 kV substations, commissioned by us and operated round the clock by our O&M teams.

Transmission Lines

400 kV, 220 kV, 132 kV and 33 kV lines, including 132 kV monopoles.

Substations

132/33 kV and 33/11 kV substations and bays, erected and commissioned.

Underground Cables

132 kV and 33 kV cable laying, jointing, terminations and testing.

Operation & Maintenance

24×7 shift operation and maintenance of substations and lines.

Erected monopole line against a blue sky Control and relay panels being commissioned
33–400 kVVoltage range
About Us

An electrical firm built on high-voltage work

Mega Electricals is a Guwahati-based electrical firm working on power transmission and distribution. We build EHV and HV infrastructure, and we operate and maintain it after it is energised.

Our work covers the full job: civil foundations and structures, erection of switchyard equipment, stringing, and testing and commissioning through to energisation.

  • Turnkey or erection basis
  • Foundation to energisation
  • 24×7 O&M teams
  • CEA safety regulations

Electrical Projects

Construction, erection, testing and commissioning from 33 kV to 400 kV.

Operation & Maintenance

Shift operation, preventive and breakdown maintenance.

Contact Us
Our Services

Complete solutions for power infrastructure

Each package includes the civil, mechanical and electrical work needed to bring the asset into service.

Lattice tower erection
Up to 400 kV

Transmission Lines

Route survey, tower spotting, foundations, lattice tower erection, conductor and earthwire stringing, sagging and clamping.

Monopole section being lifted by crane
132 kV

Monopole Lines

Monopole foundations, section assembly and crane lifts, stringing and commissioning, by day and night.

Substation equipment erection
132/33 kV · 33/11 kV

Substations & Bays

Gantries, breakers, isolators, CTs, PTs, CVTs, lightning arresters, transformer erection, bus stringing and earthing.

Underground cable laying
132 kV · 33 kV

Underground Cables

Trenching, XLPE cable pulling, jointing, terminations and cable testing.

Control panel testing
Commissioning

Testing & Commissioning

Control & relay panels, cabling and wiring, protection checks, SAS integration and bay commissioning.

Substation switchyard in operation
24×7

Operation & Maintenance

Shift operation, preventive maintenance, routine testing, line patrolling and breakdown attendance.

One electrical firm from foundation to energisation.

And afterwards, for every shift that keeps the station running.

Start a Project
How We Work

How a project runs

  1. 1

    Survey & Drawings

    Route survey, profiling and spotting.

  2. 2

    Civil & Foundations

    Tower, pole and equipment foundations.

  3. 3

    Erection & Stringing

    Structures, equipment and conductors.

  4. 4

    Testing

    Pre-commissioning and protection checks.

  5. 5

    Energisation

    Charging and handover.

Operation & Maintenance

Keeping energised assets available

Our O&M service covers the day-to-day running of substations and lines after commissioning. Operation is shift-based and every action is recorded.

  • 24×7 manning in three shifts
  • Hourly recording of current, MW / MVAR, voltage, tap position and frequency
  • Switching operations under a permit-to-work system
  • Daily log sheets, shift handover and event reporting
  • Coordination with the load despatch and the utility's control room
Switchyard bus and jumpers
Round-the-clock operationThree shifts, every day, with every action recorded.
Why Choose Us

Why work with Mega Electricals

One point of responsibility

Construction, commissioning and O&M all come from one team, so there are no hand-off gaps.

Built to energise

Every package is taken through testing to charging. We don't stop at erection.

Safety by procedure

Permit-to-work, isolation and earthing on every job, as per the CEA Regulations 2023.

Local and responsive

Based in Guwahati, with teams that can reach sites and attend breakdowns quickly.

On Site

Our teams at work

Home / Photos

Photo Gallery

Monopoles, towers, substations, panels and cables, photographed by our teams during erection, testing and commissioning.

Contact Us

Let's build and run your next substation

For line and substation projects, or an O&M contract for an existing installation, contact us directly.

Office Address

Ground Floor, Raj Apartment, 3, J.B. Road, Silpukhuri, Guwahati – 781003, Assam